Choose a topic. Open the detailed explanations when you need them.
Start with a concrete problem
Bring a task that takes too long, a stalled manual or a tool that no longer fits. We will look at how you work and what needs changing. A real example is more useful than a specification written just for the meeting.
Before deciding: scope and limits
For the first conversation, describe what you do, what blocks the work and what you want to achieve. An example, your tools and a deadline tell us more than a long feature list. An indicative budget helps choose a first step. Access and confidential documents can follow through a suitable channel.
Sometimes a diagnosis or trial is needed before the next stage can be priced. We set out its scope and cost before starting. The proposal then separates initial work, deliverables, checks and recurring costs. Exclusions and remaining uncertainties are written down.
The schedule also depends on source material, access and your approvals. We identify those dependencies at the start. If the work changes, we review price and timing before extending it. A limited batch can provide a first result on which to decide the next step.
Availability, support arrangements and coverage limits are agreed in the engagement.
Define the work to be done
An assessment or a limited initial scope, based on a real need.
Entrust your IT management
Taking over IT starts with knowing what exists and what is missing: access, backups, documentation and the state of workstations and servers. We separate this initial work from regular management so that the running cost does not hide the takeover effort.
Define what will be delivered
Initial work can be limited to an audit, a few manual pages, a data exchange or a prototype. The deliverable, necessary information and planned checks are specified in the proposal.
Understand budget and timing
Work, recurring costs and dependencies are explained before a decision.
Understand the price
Preparing sources, implementing and checking each take time. We include them in the project and set out subscriptions, hosting and maintenance separately where required. A feature added during the work is agreed before implementation.
AI can reduce the time taken by some operations. Understanding the data, connecting the tools and examining the output still take work. The estimate covers the complete job.
Set a realistic schedule
Available documents, technical access and people responsible for approval are identified. An initial usable result can be planned before all functions are complete.
Prepare the discussion and what follows
Know what to bring and what will be handed over to use the solution.
Prepare your independence
Getting started is supported. Agreed instructions, sources or exports are handed over. Maintenance and assistance can continue according to your needs.
Prepare the first discussion
Describe what you do today, the difficulty and what you would like to obtain. You can specify your deadline and budget. A description is enough to begin; sensitive documents can later be exchanged under suitable conditions.
Your questions
Can we start with a small project?
Yes. One task or a sample of documents can be the starting point. Its price mainly depends on preparation, tools to connect and necessary checks.
Must we change all our tools?
Your current tools are examined first. Connecting two applications or targeted automation may be enough.
Will I be able to use the solution independently?
Getting started and instructions are planned within the project. Desired independence and remaining assistance are defined together.
What if we want to change provider?
Sources or exports handed over, code rights and required licences are specified in the proposal. Handover conditions are known before work begins.
